Production Capacity

Production Capacity

Position: Home > Production Capacity

Aluminum substrate

Detailed information:
Aluminum plate production capacity
AI PCB Manufacturing Capacity Workmanship
 
Type Items Processing capacity
Laminate Surface finish OSP、Immersion Ag、Plating silver ,ENIG ,HAL-LF
Laminate type) Aluminum,iron and copper isolation base
Dimension 500*600MM 600*1200MM 1000*1200MM
board thickness) 0.3MM、0.4MM、0.6MM、0.8MM、1.0MM、1.2MM、1.6MM、2.0MM、2.5MM、3.0MM、4.0MM
AI type 1060、3003、5052、6061
copper foil 0.5-10 OZ
tolerance of board Thickness ±0.1MM
Dielectric thickness 0.075-0.15MM
Products Characteristics of Technology Silver mirror (light reflectivity of 96%-98%), thermoelectric separation copper substrate, iron plate, double aluminum plate, Bei Guangyuan (Light bar)
Level   1-4 Layers
Line Min trace width 0.1MM
Min trace space 0.1MM
Tolerance of trace width/space ±15%
Copper thickness Internal and external 0.5-10 OZ
Aperture Drilling hole size 0.6-6.0 MM
Finished hole size 0.6-6.0 MM
Hole tolerance ±0.075 MM
Tolerance of hole position ±0.075 MM
Aspect ratio 5 :1
Resistance welding Min solder bridge 0.1 MM
PSR4000WT02 Reflow soldering two not yellow
Site Tolerance of outline dimension ±0.1 MM、±0.05MM
  Max dimension Length: 1200MM, short direction: 650MM (Length:1200MM, Width:650MM)
Heat conduction modulus Low thermal conductivity 1.0-1.2 W/M.K(Low heat conduction 1.0-1.2 W/M.K)
Thermal conductivity 1.5-1.8 W/M.K(Middle heat conduction 1.5-1.8 W/M.K)
High thermal conductivity 2.0-3.0 W/M.K(High heat conduction 2.0-3.0 W/M.K)
Peel strength ≥ 1.8 N/MM
Surface resistance ≥ 1*105 M
Volume resistrivity ≥ 1*106 M
Breakdown voltag ≥ 2 KV,Special resistance4KV
Solder fioat 260℃,10Min No bubble,No delamination(260℃,10Min ,No layerig,No sparkling)
Permittivity ≤ 4.4
Disspation factor ≤ 0.03
 
Production capacity
 
The monthly output: 8000M2 aluminum plate, aluminum plate: Nissan 250M2.
Monthly yield of AI PCB:8000M2,Daily yield:250M2.
 
Lead Time
 
The general model for 2-3 days, urgent model: 24 hours, batch: 5-8 days.
Ordinary sample:2-3 days,Prompt sampling :24 Hours,Lot production:5-8 days.

[Return]